
Slip Disassembly – CRW 300K Series Slips
This video provides an overview of the disassembly of the slips we use to move pipe with our hydraulic completion units. The intent is to
This video provides an overview of the disassembly of the slips we use to move pipe with our hydraulic completion units. The intent is to
In this video, you will watch how Deep Well Services – Hydraulic Completion Units (HCU) use their one pick technology to fully rig over from
In this video, our DWS Competency and Training team, review the difference between Stripping and Safety Ram fronts and how they are both used in
As a follow-up to our last video on the differences between the Stripping and Safety Ram Fronts, our DWS Competency & Training team will explain
In this video, we leave our warm Training facility and head out to the field to explain how our HCU’s make drilling connections in the
For the 1st video of 2021, our Training and Competency department will be discussing the Pressure Control components found on our HCU’s and the functionality
In the first DWS video, we reviewed the process required to disassemble CRW 300K Slips, which are used globally on our Hydraulic Completion Units (HCU).
Hot Tap is one of the more unique and unknown operations we perform here at Deep Well Services. As we continue with our video series,
In part 1 of our newest DWS video, our Competency & Training Coordinator walks through the basic overview of a critical piece of well control
In part 2 of 3, in our look into Primary Accumulators, Kevin Goold reviews some basic tips and system areas to watch for when performing